Sunday, April 24, 2005


Beyond the orange rebar caps you can see that insulation is being attached to the foundation. This view is from the front entrance looking toward Main Street.

The form on top of the sawhorses is a rebar mat which will reinforce the concrete below it. The concrete is the base for a building column.

The wooden form is in place to put a concrete footing near the old building.

Friday, April 15, 2005


The worker with the blue construction hat is standing where the ramp for an emergency exit from the Children's Room will be located.

A view of the future entrance from the parking lot. This entrance in directly opposite the Main Street entrance.

The walls are now being formed at the rear of the new addition, near the parking lot.

Friday, April 08, 2005


A view of the location where the original entrance stairccase was, and on the right, the location of the future entrance.

A view from the front lawn of the layout of the foundation.

An up-close view of the walls being formed.

Walls are being formed on the part of the building near the fire station.