Friday, September 30, 2005
Previous Posts
- The second egress stair is being built. This one ...
- This is the roof over the rear entrance. It is pr...
- The sloped roof now is framed with wood. Slate wi...
- The plumbing for the public women's room near the ...
- This scaffolding is for the masons. Beginning nex...
- A closeup view of the roof framing.
- The contractor is now framing the roof.
- The mason has put together this panel showing exte...
- The first stairway is being built! This one is ne...
- A closeup of the interior ramp and stairs.
Feb 2005 Demolition
Mar 2005 Site work and excavation
Mar 2005 Concrete footings and foundations
Mar - May 2005 Underground utilities
May 2005 Structural steel erection
Jun 2005 Interior concrete floor slabs
Jul 2005 Exterior and interior wall framing
Aug 2005 Exterior masonry and interior drywall
Sep 2005 Masonry restoration
Sep - Oct 2005 Site improvements
Oct 2005 Windows (existing building)
Nov 2005 - May 2006 Interior finishes
Jan 2006 Elevator installation
Mar - Apr 2006 Sidewalks, paving, curbing
Jun 2006 Landscaping
Jul 2006 Move back to 123 Main
Aug 2006 Grand Reopening!